Your browser does not support JavaScript! Skip to main content
Free 30-day trial DO-178C Handbook RapiCoupling Preview DO-178C Multicore Training Multicore Resources
Rapita Systems
 

Industry leading verification solutions

View All

Software Verification with RVS

RapiTest - Functional testing RapiCover - Coverage analysis RapiTime - Timing analysis RapiTask - RTOS scheduling visualization RapiCoverZero - Zero-footprint coverage analysis RapiTimeZero - Zero-footprint timing analysis RapiTaskZero - Zero-footprint scheduling analysis RVS Qualification Kits - Tool qualification for DO-178C RapiCouplingPreview - DCCC analysis

Multicore Verification with MACH178

MACH178 Core Pack - Getting started MACH178 Platform Pack - Platform evaluation MACH178 Resource Pack - Interference verification MACH178 Qualification Pack- Tool qualification

Product-related services

Tool Integration Training Consultancy Support

Other Solutions

RTBx - The ultimate data logging solution Sim68020 - Motorola 68020 Simulation

Using Our Solutions

RVS Development roadmap Product life cycle policy RVS Assurance issue policy

Latest from Rapita HQ

Latest news

Rapita Systems Collaborates with Wind River to Break the Multicore Certification Barrier
MACH178 Rapita Systems Launches Next Generation of MACH178 for Multicore
RVS 3.24 accelerates multicore software verification
Rapita Systems and Avionyx Announce Strategic Partnership to Offer Best-in-class Avionics Solutions
View News

Latest from the Rapita blog

The Evolution of DO-178 and ED-12 Standards
Retro gaming with the Sim68020
RVS gets a new timing analysis engine
How to measure stack usage through stack painting with RapiTest
View Blog

Latest discovery pages

Processor How to achieve multicore DO-178C certification with Rapita Systems
Plane How to achieve DO-178C certification with Rapita Systems
Military Drone Certifying Unmanned Aircraft Systems
control_tower DO-278A Guidance: Introduction to RTCA DO-278 approval
View Discovery pages

Upcoming events

DASC 2026
2026-09-13
DO-178C Multicore Virtual Training
2026-09-29
HISC 2026
2026-10-13
Supporting Multicore Interference Analysis using Branch Traces
2026-11-24
View Events

Technical resources for industry professionals

Latest White papers

Mitigation of interference in multicore processors for A(M)C 20-193
Sysgo WP
Developing DO-178C and ED-12C-certifiable multicore software
DO178C Handbook
Efficient Verification Through the DO-178C Life Cycle
View White papers

Latest Videos

Supporting Multicore Interference Analysis using Branch Traces
Multicore Avionics (Aerospace Innovations)
AMACC Rev B & Multicore Certification: What U.S. Defense Programs Need to Know for Airworthiness Success
Certification-Ready Rust: GNAT Pro & RVS for Avionics Standards
View Videos

Latest Case studies

Case Study Front Cover
Multicore timing analysis support for ECSS-E-ST-40C R&D with MACH178
GMV case study front cover
GMV verify ISO26262 automotive software with RVS
Kappa: Verifying Airborne Video Systems for Air-to-Air Refueling using RVS
View Case studies

Other Resources

 Webinars

 Brochures

 Product briefs

 Technical notes

 Research projects

 Flyers

 Multicore resources

Discover Rapita

About us

The company menu

  • Customers
  • Partners & Distributors
  • Research projects
  • Contact us
  • Careers
  • Working at Rapita
  • Subscribe to newsletter

Industries

  Civil Aviation (DO-178C)   Military & Defense   Automotive (ISO 26262)   Space

Standards

  DO-178C   A(M)C 20-193

US office


info@rapitasystems.com Rapita Systems, Inc., 41131 Vincenti Ct., Novi, MI 48375, USA

UK office

+44 (0)1904 413945
info@rapitasystems.com Rapita Systems Ltd., Atlas House, Osbaldwick Link Road, York, YO10 3JB, UK

Spain office

+34 93 351 02 05
info@rapitasystems.com Rapita Systems S.L., Parc UPC, Edificio K2M, c/ Jordi Girona, 1-3, Barcelona 08034, Spain
Back to Top

Seven misconceptions of MC/DC #2: Getting 100% MC/DC means your compiler compiled your code correctly

2013-02-25

So, assuming that you've run all of your tests and you've achieved 100% MC/DC. Does that mean that the compiler has correctly compiled your code?

In short, the answer is no.

Let's see an example to illustrate a case where 100% MC/DC fails to expose a compiler fault.

Imagine that some optimization rule is wrong in your version of the compiler and functions that start with an or operation accidentally get xor operations instead. Can you still achieve 100% MC/DC for software generated with this compiler without exposing the fault? It turns out that you can!

As an example, assume that the expression you are testing is (written in Ada):

x := y or z;

In C the same expression could be written as:

x = (y!=0) | (z!=0);

Note that we've used a bitwise or in this case, as the logical or (||) has slightly different behavior, namely the second expression isn't evaluated if the first expression is true, which is different to the Ada code's behavior.

We can achieve 100% MC/DC for the above code with the following test cases:

  1. Input: y = True, z = False; Output: x = True
  2. Input: y = False, z = True; Output: x = True
  3. Input: y = False, z = False; Output: x = False

In this situation, Testcase 1 and Testcase 3 together achieve the MC/DC of condition y, and Testcase 2 and Testcase 3 achieve MC/DC of condition z.

If the compiler generates code where x is defined as y xor z, executing the test cases defined above would give you exactly the results you expect. However, if you happened to rerun the tests with both y and z as True (not required for MC/DC), the behavior of the code would be incorrect (you would expect a True result and would actually get a False result). Clearly, MC/DC is not a good way to argue that object code is correctly generated.

Next: Getting 100% MC/DC means you've tested 100% of your requirements »

« Previous: Getting 100% MC/DC means you've got correct code

DO-178C webinars

DO178C webinars

White papers


Mitigation of interference in multicore processors for A(M)C 20-193
Sysgo WP
Developing DO-178C and ED-12C-certifiable multicore software
DO178C Handbook
Efficient Verification Through the DO-178C Life Cycle

A Commercial Solution for Safety-Critical Multicore Timing Analysis

Related blog posts

Seven misconceptions of MC/DC #4: Once you've tested 100% of your requirements you should add the extra tests needed to achieve MC/DC

.
2013-03-19

Seven misconceptions of MC/DC #3: Getting 100% MC/DC means you've tested 100% of your requirements

.
2013-03-13

Seven misconceptions of MC/DC #1: Getting 100% MC/DC means you've got correct code

.
2013-02-12

Seven misconceptions of MC/DC

.
2013-02-05

Pagination

  • First page « First
  • Previous page ‹ Previous
  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Current page 5
  • Page 6
  • Next page Next ›
  • Last page Last »
  • Solutions
    • Rapita Verification Suite
    • RapiTest
    • RapiCover
    • RapiTime
    • RapiTask
    • MACH178
  • Latest
  • Latest menu

    • News
    • Blog
    • Events
    • Videos
  • Success Stories
  • Success Stories Menu

    • Airbus Defence & Space
    • BAE Systems
    • Cobham
    • Collins Aerospace
    • Leonardo
  • Downloads
  • Downloads menu

    • Brochures
    • Webinars
    • White Papers
    • Case Studies
    • Product briefs
    • Technical notes
    • Software licensing
  • Company
  • Company menu

    • About Rapita
    • Careers
    • Customers
    • Industries
    • Locations
    • Partners
    • Research projects
    • Contact
  • Discover
    • Multicore Timing Analysis
    • Worst Case Execution Time
    • WCET Tools
    • Code coverage for Ada, C & C++
    • MC/DC Coverage
    • Verifying additional code for DO-178C
    • Data Coupling & Control Coupling
    • DO-178C
    • AC 20-193 and AMC 20-193
    • Certifying eVTOL
    • Certifying UAS

All materials © Rapita Systems Ltd. 2026 - All rights reserved | Privacy information | Trademark notice Subscribe to our newsletter