Your browser does not support JavaScript! Skip to main content
Free 30-day trial DO-178C Handbook RapiCoupling Preview DO-178C Multicore Training Multicore Resources
Rapita Systems
 

Industry leading verification tools

Rapita Verification Suite (RVS)

RapiTest - Functional testing for critical software RapiCover - Low-overhead coverage analysis for critical software RapiTime - In-depth execution time analysis for critical software RapiTask - RTOS scheduling visualization RapiCoverZero - Zero-footprint coverage analysis RapitimeZero - Zero-footprint timing analysis RapiTaskZero - Zero-footprint event-level scheduling analysis RVS Qualification Kits - Tool qualification for DO-178 B/C and ISO 26262 projects RapiCoupling - DCCC analysis

Multicore Verification

MACH178 - Multicore Avionics Certification for High-integrity DO-178C projects MACH178 Foundations - Lay the groundwork for A(M)C 20-193 compliance Multicore Timing Solution - Solving the challenges of multicore timing analysis RapiDaemon - Analyze interference in multicore systems

Other

RTBx - The ultimate data logging solution Sim68020 - Simulation for the Motorola 68020 microprocessor

RVS Software Policy

Software licensing Product life cycle policy RVS Assurance issue policy RVS development roadmap

Industry leading verification services

Engineering Services

V&V Services Data Coupling & Control Coupling Object code verification Qualification Training Consultancy Tool Integration Support

Latest from Rapita HQ

Latest news

Rapita partners with Asterios Technologies to deliver solutions in multicore certification
SAIF Autonomy to use RVS to verify their groundbreaking AI platform
RVS 3.22 Launched
Hybrid electric pioneers, Ascendance, join Rapita Systems Trailblazer Partnership Program
View News

Latest from the Rapita blog

How emulation can reduce avionics verification costs: Sim68020
Multicore timing analysis: to instrument or not to instrument
How to certify multicore processors - what is everyone asking?
Data Coupling Basics in DO-178C
View Blog

Latest discovery pages

Military Drone Certifying Unmanned Aircraft Systems
control_tower DO-278A Guidance: Introduction to RTCA DO-278 approval
Picture of a car ISO 26262
DCCC Image Data Coupling & Control Coupling
View Discovery pages

Upcoming events

DASC 2025
2025-09-14
DO-178C Multicore In-person Training (Fort Worth, TX)
2025-10-01
DO-178C Multicore In-person Training (Toulouse)
2025-11-04
HISC 2025
2025-11-13
View Events

Technical resources for industry professionals

Latest White papers

Mitigation of interference in multicore processors for A(M)C 20-193
Sysgo WP
Developing DO-178C and ED-12C-certifiable multicore software
DO178C Handbook
Efficient Verification Through the DO-178C Life Cycle
View White papers

Latest Videos

How to make AI safe in autonomous systems with SAIF
Rapita Systems - Safety Through Quality
Simulation for the Motorola 68020 microprocessor with Sim68020
AI-driven Requirements Traceability for Faster Testing and Certification
View Videos

Latest Case studies

GMV case study front cover
GMV verify ISO26262 automotive software with RVS
Kappa: Verifying Airborne Video Systems for Air-to-Air Refueling using RVS
Supporting DanLaw with unit testing and code coverage analysis for automotive software
View Case studies

Other Resources

 Webinars

 Brochures

 Product briefs

 Technical notes

 Research projects

 Multicore resources

Discover Rapita

Who we are

The company menu

  • About us
  • Customers
  • Distributors
  • Locations
  • Partners
  • Research projects
  • Contact us
  • Careers
  • Working at Rapita

Industries

  Civil Aviation (DO-178C)   Automotive (ISO 26262)   Military & Defense   Space

US office

+1 248-957-9801
info@rapitasystems.com Rapita Systems, Inc., 41131 Vincenti Ct., Novi, MI 48375, USA

UK office

+44 (0)1904 413945
info@rapitasystems.com Rapita Systems Ltd., Atlas House, Osbaldwick Link Road, York, YO10 3JB, UK

Spain office

+34 93 351 02 05
info@rapitasystems.com Rapita Systems S.L., Parc UPC, Edificio K2M, c/ Jordi Girona, 1-3, Barcelona 08034, Spain
Back to Top Contact Us

If RapiTime provides Ipoint coverage, why do I need RapiCover?

2013-10-09

Users of RapiTime will probably be aware that one of the categories of information shown in a RapiTime report is "Ipoint Coverage". So, given that RapiTime supplies coverage information, why do you need RapiCover?

The answer relates to the way this information is intended to be used, and also the sections of the source code that it relates to.

What is the purpose of RapiTime's Ipoint coverage measurement?

At first glance, RapiTime provides coverage information, i.e. an indication of how much code was exercised during testing. However, there is a specific motivation behind RapiTime’s display of coverage data.

RapiTime's analysis is carried out at the basic block level - as part of the process it generates a control-flow graph representing all the possible paths through all the blocks in the software. It then inserts instrumentation at the scope boundaries to allow it to calculate the execution time of each basic block. By a combination of analysing all the possible paths through the code, and measuring the execution time for each basic block, RapiTime is able to calculate a worst-case execution time value for the software.

In order to ensure this value is accurate (in particular, to make sure that the WCET is not optimistic) the software must be adequately exercised during the testing. As a minimum, to obtain an accurate WCET value it is necessary to have executed each basic block of code at least once. As each Ipoint is associated with a single block of code, we can tell how effectively the code has been exercised by reporting the number of executed and un-executed Ipoints. This is reason behind the Ipoint coverage measurement shown in the RapiTime report.

So why do I need RapiCover?

Typical coverage tools provide information on so-called "structural coverage metrics" - that is, the coverage information is associated with particular elements of the source code structure. Typical structural elements include functions, statements and decisions. Software developed at the highest levels of criticality is tested for coverage at MC/DC level, which requires that the effect of each condition that can contribute to the outcome of a decision must be observed during testing. Structural code coverage information is used to confirm that software has been adequately exercised during testing, and it is this type of coverage measurement, up to and including MC/DC, that RapiCover is intended to provide.

screenshot showing RapiCover structural coverage

Figure 1: RapiCover structural coverage

Because RapiTime’s Ipoint coverage is reported at the basic block level it is not possible to use it to determine structural coverage using any of the traditional metrics (other than function coverage). RapiCover inserts instrumentation to allow it to calculate structural coverage for the chosen metric. Typically, this requires more instrumentation than is necessary for timing, located at different points in the source code. The execution traces generated by instrumentation provide you with code coverage metrics which identify which sections of code are either untested or covered by unnecessary test cases.

DO-178C webinars

DO178C webinars

White papers

Mitigation of interference in multicore processors for A(M)C 20-193
Sysgo WP Developing DO-178C and ED-12C-certifiable multicore software
DO178C Handbook Efficient Verification Through the DO-178C Life Cycle
A Commercial Solution for Safety-Critical Multicore Timing Analysis

Related blog posts

Test your testing skills with RapiCover on Tetris

.
2014-10-24

What’s the difference between a SIL and a DAL? How does it affect my Code Coverage?

.
2014-10-07

Mark explains what code coverage is for

.
2014-07-15

What are the implications of multi-core devices on code coverage?

.
2014-02-04

Pagination

  • First page « First
  • Previous page ‹ Previous
  • Page 1
  • Page 2
  • Current page 3
  • Page 4
  • Page 5
  • Page 6
  • Next page Next ›
  • Last page Last »
  • Solutions
    • Rapita Verification Suite
    • RapiTest
    • RapiCover
    • RapiTime
    • RapiTask
    • MACH178

    • Verification and Validation Services
    • Qualification
    • Training
    • Integration
  • Latest
  • Latest menu

    • News
    • Blog
    • Events
    • Videos
  • Downloads
  • Downloads menu

    • Brochures
    • Webinars
    • White Papers
    • Case Studies
    • Product briefs
    • Technical notes
    • Software licensing
  • Company
  • Company menu

    • About Rapita
    • Careers
    • Customers
    • Distributors
    • Industries
    • Locations
    • Partners
    • Research projects
    • Contact
  • Discover
    • Multicore Timing Analysis
    • Embedded Software Testing Tools
    • Worst Case Execution Time
    • WCET Tools
    • Code coverage for Ada, C & C++
    • MC/DC Coverage
    • Verifying additional code for DO-178C
    • Timing analysis (WCET) & Code coverage for MATLAB® Simulink®
    • Data Coupling & Control Coupling
    • Aerospace Software Testing
    • DO-178C
    • Meeting DO-178C Objectives
    • AC 20-193 and AMC 20-193
    • Meeting A(M)C 20-193 Objectives
    • Certifying eVTOL
    • Cerifying UAS

All materials © Rapita Systems Ltd. 2025 - All rights reserved | Privacy information | Trademark notice Subscribe to our newsletter