Your browser does not support JavaScript! Skip to main content
Free 30-day trial DO-178C Handbook RapiCoupling Preview DO-178C Multicore Training Multicore Resources
Rapita Systems
 

Industry leading verification tools

Rapita Verification Suite (RVS)

RapiTest - Functional testing for critical software RapiCover - Low-overhead coverage analysis for critical software RapiTime - In-depth execution time analysis for critical software RapiTask - RTOS scheduling visualization RapiCoverZero - Zero-footprint coverage analysis RapiTimeZero - Zero-footprint timing analysis RapiTaskZero - Zero-footprint event-level scheduling analysis RVS Qualification Kits - Tool qualification for DO-178 B/C and ISO 26262 projects RapiCouplingPreview - DCCC analysis

Multicore Verification

MACH178 - Multicore Avionics Certification for High-integrity DO-178C projects MACH178 Foundations - Lay the groundwork for A(M)C 20-193 compliance RapiDaemons - Analyze interference in multicore systems

Other

RTBx - The ultimate data logging solution Sim68020 - Simulation for the Motorola 68020 microprocessor

RVS Software Policy

Software licensing Product life cycle policy RVS Assurance issue policy RVS development roadmap

Industry leading verification services

Engineering Services

Data Coupling & Control Coupling Object code verification Qualification Training Consultancy Tool Integration Support

Latest from Rapita HQ

Latest news

RVS 3.23 Launched
Rapita System Announces New Distribution Partnership with COONTEC
Rapita partners with Asterios Technologies to deliver solutions in multicore certification
SAIF Autonomy to use RVS to verify their groundbreaking AI platform
View News

Latest from the Rapita blog

What does AMACC Rev B mean for multicore certification?
How emulation can reduce avionics verification costs: Sim68020
Multicore timing analysis: to instrument or not to instrument
How to certify multicore processors - what is everyone asking?
View Blog

Latest discovery pages

Military Drone Certifying Unmanned Aircraft Systems
control_tower DO-278A Guidance: Introduction to RTCA DO-278 approval
Picture of a car ISO 26262
DCCC Image Data Coupling & Control Coupling
View Discovery pages

Upcoming events

DASC 2025
2025-09-14
DO-178C Multicore In-person Training (Fort Worth, TX)
2025-10-01
Avionics Certification Q&A: CERT TALK (with Consunova and Visure)
2025-10-01
DO-178C Multicore In-person Training (Toulouse)
2025-11-04
View Events

Technical resources for industry professionals

Latest White papers

Mitigation of interference in multicore processors for A(M)C 20-193
Sysgo WP
Developing DO-178C and ED-12C-certifiable multicore software
DO178C Handbook
Efficient Verification Through the DO-178C Life Cycle
View White papers

Latest Videos

Certification-Ready Rust: GNAT Pro & RVS for Avionics Standards
Accelerated software verification with RVS 3.23
Getting started with RVS
Requirements traceability with RapiTest and Polarion ALM
View Videos

Latest Case studies

Case Study Front Cover
Multicore timing analysis support for ECSS-E-ST-40C R&D with MACH178
GMV case study front cover
GMV verify ISO26262 automotive software with RVS
Kappa: Verifying Airborne Video Systems for Air-to-Air Refueling using RVS
View Case studies

Other Resources

 Webinars

 Brochures

 Product briefs

 Technical notes

 Research projects

 Multicore resources

Discover Rapita

About us

The company menu

  • Customers
  • Partners & Distributors
  • Research projects
  • Contact us
  • Careers
  • Working at Rapita
  • Subscribe to newsletter

Industries

  Civil Aviation (DO-178C)   Automotive (ISO 26262)   Military & Defense   Space

Standards

  DO-178C   A(M)C 20-193

US office

+1 248-957-9801
info@rapitasystems.com Rapita Systems, Inc., 41131 Vincenti Ct., Novi, MI 48375, USA

UK office

+44 (0)1904 413945
info@rapitasystems.com Rapita Systems Ltd., Atlas House, Osbaldwick Link Road, York, YO10 3JB, UK

Spain office

+34 93 351 02 05
info@rapitasystems.com Rapita Systems S.L., Parc UPC, Edificio K2M, c/ Jordi Girona, 1-3, Barcelona 08034, Spain
Back to Top Contact Us

Blog

All blogs

Hardware acceleration features that make real-time hard - instruction caches

Continuing our series on how the presence of advanced hardware features in modern processors makes it more difficult to…

2013-01-07

"Ada: There's life in the old girl yet"

We're big fans of Ada, so the news about the approval of the Ada 2012 Standard caught our eye.

2012-12-18

Using MC/DC to (un)cover a (Daily) WTF

In a recent "Daily WTF" I saw an example of “over-defensive programming” (http://thedailywtf.com/Articles/ButAnything-…

2012-12-10

Major trends in automotive software development

Automotive software development is a growth area in the global automotive industry. So what are some of the major…

2012-12-03

Hardware acceleration features that make real-time hard – pipelined architectures

In a recent blog post we observed how the presence of

2012-11-28

DO-178B, DO-178C and Worst-Case Execution Time

In the world of aerospace software engineering, development is guided by the objectives of DO-178B (or the more recent…

2012-11-19

How do I set up an MPC5xx IO port to collect data?

At Rapita, our main interest in writing to output ports of microcontrollers is to provide an efficient means of…

2012-11-12

Rapita tool qualification support

Our aim with tool qualification support is to ensure that you can qualify RVS tools for use on your project. With that…

2012-11-05

Hardware acceleration features that make real-time hard – an overview

New performance-enhancing features in modern processors can mean it is harder, not easier, to establish the worst-case…

2012-10-29

Measuring software timing under DO-178B – does multicore make a difference?

What do you need to know about the differences between execution time analysis in single-core and multicore…

2012-10-22

Masking MC/DC? What's all that about then?

If you're involved in developing and verifying high integrity software (especially if DO-178B is involved), you have

2012-10-13

Goldilocks WCET: Not too optimistic, not too pessimistic

How do you get the balance right between "optimistic" and "pessimistic" WCET?

2012-10-08

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 8
  • Page 9
  • Page 10
  • Page 11
  • Current page 12
  • Page 13
  • Page 14
  • Page 15
  • Page 16
  • …
  • Next page Next ›
  • Last page Last »

RapiTimes

Subscribe to the RapiTimes newsletter to receive updates about our blog posts, webinars, product releases, white papers and industry news.

Subscribe

Popular tags

Code coverage Timing analysis Multicore FACE Testing WCET Qualification MC/DC A(M)C 20-193 Rapita RTBx Scheduling RVS Ada MACH178 DO-178B/C C RapiCover RapiTest RapiTask RapiTime RapiTetris Embedded ISO26262 Optimization Research project All Blogs
  • Solutions
    • Rapita Verification Suite
    • RapiTest
    • RapiCover
    • RapiTime
    • RapiTask
    • MACH178

    • Verification and Validation Services
    • Qualification
    • Training
    • Integration
  • Latest
  • Latest menu

    • News
    • Blog
    • Events
    • Videos
  • Downloads
  • Downloads menu

    • Brochures
    • Webinars
    • White Papers
    • Case Studies
    • Product briefs
    • Technical notes
    • Software licensing
  • Company
  • Company menu

    • About Rapita
    • Careers
    • Customers
    • Distributors
    • Industries
    • Locations
    • Partners
    • Research projects
    • Contact
  • Discover
    • Multicore Timing Analysis
    • Embedded Software Testing Tools
    • Worst Case Execution Time
    • WCET Tools
    • Code coverage for Ada, C & C++
    • MC/DC Coverage
    • Verifying additional code for DO-178C
    • Timing analysis (WCET) & Code coverage for MATLAB® Simulink®
    • Data Coupling & Control Coupling
    • Aerospace Software Testing
    • DO-178C
    • Meeting DO-178C Objectives
    • AC 20-193 and AMC 20-193
    • Meeting A(M)C 20-193 Objectives
    • Certifying eVTOL
    • Certifying UAS

All materials © Rapita Systems Ltd. 2025 - All rights reserved | Privacy information | Trademark notice Subscribe to our newsletter